Powered By Kitlog Pro v2.0
My RV-8 build
RV-8
Fuselage
3-8-2013
< Previous Log Entry
Next Log Entry >
Date:
3-8-2013
Number of Hours:
1.00
Manual Reference:
Page 8-23
Brief Description:
Tailcone bulkheads #3
Entry #2
Clecoed the F-810 angle and the bulkhead to gether, and final drilled.
Straightened out the flanges.
Clecoed the F-809 L&R, final drilled and straightened out the flanges.
Deburred, cleaned and primed and riveted to together.
F-810
F-809
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
RV-8 Home
Category
# Logs
# Hours
All
452
866
About me
1
1
Avionics
3
4
Canopy
3
6
Electrical
4
6
Empennage
74
120
Engine
6
10
Finishing Kit
2
2
Flying
3
4
Fuselage
147
353
Instruments
2
0
Miscellaneous
14
36
Panel
7
17
Practice Kits
1
1
Tools
6
16
Wings
178
287
Workshop
1
3
Copyright © 2001-2024 Matronics. All Rights Reserved.